Description: 4/11/2022, I finished importing the fieldwork into the SDE at University Village. University Village has gone from overhead power to underground power. The work started the Summer of 2021 and completed Spring of 2022. I went out on 4/4/2022 and GPS the above ground infrastructure. The receiver in good sky was getting better than an inch accuracy; however, much of this neighborhood has thick evergreen tree cover. Robert Holder and Mike Stamey held the GPS receiver to speed up the collection process. The powerlines are drawn connecting the collected points unless it was noticed that trenching was done. I also used a model given to me by Matt Makdad. Here Is a link to the entire project. This feature class houses the small pull boxes as requested by Makdad 4/5/2022. This data starts at University Village after fieldwork 4/4/2022.