ArcGIS REST Services Directory
JSON

Layer: PrimaryUG_10282020 (ID:2)

View In:   Map Viewer

Name: PrimaryUG_10282020

Display Field: CreationUser

Type: Feature Layer

Geometry Type: esriGeometryPolyline

Description: 9/10/2018 Installed a primary power line behind Bowie waiting for survey, Line is approximate using photography and a pesron who installed it. 7/9/2018 This, feature class was updated with a 2017 survey. The Old High School property was surveyed by Timothy W. Caldwell License number L-5232, September 27, 2017, Mattern & Crag Engineers and Surveyors. Data is considered 90% accurate, and data was collected between 8/ 5-18 / 2017. All coordinates are based on NCGS NAD/83/ 2011 and all elevations are based on NAVD 88. 4/17/2018 Updated by NRLP Staff10/2/2017 Edward Hyle updated ASU Primary Underground power lines, now need help to further clean feature class from NRLP. I removed artifacts and segmented lines, line segments in a series were linked together.9/28/2017 Edward Hyle, Started deleting duplicate lines, small segments, and drawing longer complete lines. 8/22/2017 Mainly ASU Power lines Ready for editing.3/6/2017 Editor Tracker has been added to this feature class. All of the attributes have been appropriately updated and meaningless columns omitted. However, this is a work in progress.Primary power is the transmission of medium voltage between 2kV and 35kV to a transformer, where the voltage is then stepped down so that it can be consumed by residential and commercial customers. This data set consist of 234 polylines representing 6 different circuits. It is not shown how and when this data was collected. The line weight for each line is 25 with a color of 10, which is a bright red in CAD. The RefName column is left blank, and the elevation column has only 6 entries. The circuits consist of 201, 202, 203, 205, 206, 207. Circuit 201 consist of 121 lines with a length of 16255 feet. Circuit 202 consist of 29 lines with a length of 8208 feet. Circuit 203 consist of 12 lines with a length of 2686 feet. Circuit 205 consist of 33 lines with a length of 3447 feet. Circuit 206 consist of 24 lines with a length of 3252 feet. Circuit 207 consist of 15 lines with a length of 2423 feet. ESRI, Woodard & Curran, Rochester & Associates, Inc. New River Light & Power, Highland Mapping, ASU Technology support, Art Rex and Edward Hyle

Copyright Text: Appalachian GIS

Min. Scale: 0

Max. Scale: 0

Default Visibility: true

Max Record Count: 4000

Supported query Formats: JSON, geoJSON, PBF

Use Standardized Queries: True

Extent:

Drawing Info:

HasZ: false

HasM: false

Has Attachments: false

Has Geometry Properties: true

HTML Popup Type: esriServerHTMLPopupTypeAsHTMLText

Object ID Field: OBJECTID

Unique ID Field:

Global ID Field: GlobalID

Type ID Field:

Fields:
Templates:

Is Data Versioned: false

Has Contingent Values: false

Supports Rollback On Failure Parameter: true

Last Edit Date: 10/28/2020 7:21:14 PM

Schema Last Edit Date: 10/28/2020 7:21:14 PM

Data Last Edit Date: 10/28/2020 7:21:14 PM

Supported Operations:   Query   Query Pivot   Query Top Features   Query Analytic   Query Bins   Add Features   Update Features   Delete Features   Apply Edits   Calculate   Generate Renderer   Validate SQL   Get Estimates   ConvertFormat