Name: CF_critical_pathway
Display Field: Name
Type: Feature Layer
Geometry Type: esriGeometryPolyline
Description: CF_critical_pathway
Copyright Text:
Min. Scale: 100000
Max. Scale: 0
Default Visibility: true
Max Record Count: 1000
Supported query Formats: JSON, geoJSON, PBF
Use Standardized Queries: True
Extent:
XMin: 352221.1328
YMin: 176667.869000001
XMax: 360452.3335
YMax: 179399.8095
Spatial Reference: 27700 (27700)
Drawing Info:
{"renderer":{"type":"simple","symbol":{"type":"esriSLS","style":"esriSLSSolid","color":[230,76,0,255],"width":1},"label":"","description":""},"transparency":0,"labelingInfo":null}
HasZ: true
HasM: false
Has Attachments: false
Has Geometry Properties: true
HTML Popup Type: esriServerHTMLPopupTypeAsHTMLText
Object ID Field: OBJECTID
Unique ID Field:
IsSystemMaintained : True
Global ID Field:
Type ID Field:
Fields:
- Name (type: esriFieldTypeString, alias: Name, SQL Type: sqlTypeOther, length: 200, nullable: true, editable: true)
- Length (type: esriFieldTypeDouble, alias: Length, SQL Type: sqlTypeOther, nullable: true, editable: true)
- OBJECTID (type: esriFieldTypeOID, alias: OBJECTID, SQL Type: sqlTypeOther, length: 0, nullable: false, editable: false)
- Cost (type: esriFieldTypeString, alias: Cost, SQL Type: sqlTypeOther, length: 7, nullable: true, editable: true)
- PROVING_SCALE (type: esriFieldTypeSmallInteger, alias: Proving scale, SQL Type: sqlTypeOther, nullable: true, editable: true)
- ROUTE_NOTES (type: esriFieldTypeString, alias: Notes, SQL Type: sqlTypeOther, length: 255, nullable: true, editable: true)
- Shape__Length (type: esriFieldTypeDouble, alias: Shape__Length, SQL Type: sqlTypeDouble, nullable: true, editable: false)
Templates:
Name: CF_critical_pathway
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Is Data Versioned: false
Has Contingent Values: false
Supports Rollback On Failure Parameter: true
Last Edit Date: 8/7/2020 2:31:55 PM
Schema Last Edit Date: 8/7/2020 2:31:55 PM
Data Last Edit Date: 8/7/2020 2:31:55 PM
Supported Operations:
Query
Query Pivot
Query Top Features
Query Analytic
Query Bins
Generate Renderer
Validate SQL
Get Estimates
ConvertFormat