Description: The trails were reviewed and compared to the 2017 and 2019 aerial imagery to determine if trails have been constructed or it is still in planning stage. Trails closely following exisitng trails were edited to follow the existing footprint of the trail. A determination of surface material was also made based on the aerial imagery, see Field Descriptions below. Field Descriptions:Status contains values determining the presence or abscene of exisitng trail, sidewalk, or bike lane and determination of surface material. BL = Bike Lane present and marked separately from travel lane, or Bike Lane markings within the travel lane. BL; SW = Bike Lane present and marked separately from travel lane and Sidewalk also present along the road. Built = Trail has been built and appears to be asphalt. Built; BL = Trail has been built and appears to be asphalt and Bike Lane present and marked separately from travel lane.Natural = Trail has been "built" and appears to be natural surface or stone dust. CW = Cross Walk portion of trail. For trails crossing roadways and intersecting with other Trails, the portion of the trail in the cross walk was demarcated separately. OnPlan = Digitized trail from 1980 Countywide Trails Map Plan, no apparent trail visible in vicinity. SW = Sidewalk portion of trail. Trail follows an existing sidewalk and appears to be concrete.