Description: This point dataset shows the Capital Improvements Projects (CIP) in the current 6-year Capital Facility Plan as well as completed projects. Capital Improvement Projects address a range of flooding, water quality and Habitat concerns. These points represent the general vicinity of the CIP.Type Code and Definitions: AC- Acquisition, C-Culvert, CMR-Channel Migration Resistent, CN-Conveyance Pipe, DP-Detention Pipe, DS-Drainage Study, FL-Floodproofing, FP-Fish Passage Improvements, FR-Floodplain Reconnection/Restoration, IP- Infiltration Pond, PR- Passive Recreation, PS-Pump Station, RR-Road Raising, SB- Streambank Stabilization, SL-Setback Levee, SM-Sediment Management, SP-Sedimentation Pond, SR- Stream Restoration, SWR-Stormwater Retrofit and WL-Wetland Mitigation/Banking.